Working With an Offshore Engineering Team
Last updated:
Saying it plainly
We are a UK company with a head office in London and an engineering office in Lahore. That is how our pricing works and it is a fact about the engagement, so we put it in the first conversation rather than letting clients discover it.
What follows is what actually changes, including the parts that are inconvenient.
What genuinely goes wrong
- Decision latency. A question asked at 5pm UK time that needs an answer to proceed can cost most of a working day.
- Written communication quality. Distributed teams live on writing. Vague writing that would be corrected in a corridor conversation propagates.
- Context loss. Nobody overhears the sales call, so nobody absorbs the context that call contained.
- Timezone drift on urgency. “Urgent” at 6pm in one place is tomorrow morning in another.
Distance does not cause project failure. Latency in decisions does, and distance is only one of the things that causes latency.
What we do about each
- Overlap hours committed in the contract. Not “we are flexible” — specific hours when the team is reachable.
- Written updates twice a week in a fixed format, so nothing depends on being in a meeting.
- A UK-hours point of contact for anything commercial or urgent.
- Recorded demos so a missed session is not a lost week.
- Decisions logged in writing with the reasoning, because the person who needs it will read it three months later.
The overlap actually available
| Your location | Overlap with Lahore | Practical effect |
|---|---|---|
| UK | 5–6 hours | Comfortable; a 5pm question is often answered overnight |
| Western Europe | 5–6 hours | Same |
| US East | 2–3 hours | Workable with shifted hours |
| US West | 1–2 hours | Needs deliberate arrangement |
| Australia | 4–5 hours | Comfortable, inverted |
For US clients we shift part of the team's day rather than pretending the overlap is sufficient. It is a real cost and it is better than a project where every question takes 24 hours.
The advantage nobody mentions
Work happens while you sleep. A question answered at the end of your day frequently has a result waiting when you start the next one. Over a twelve-week project that is a meaningful amount of elapsed time.
It only works if the question was answered clearly enough to act on. That is why the writing discipline matters more here than in a co-located team.
What to ask any distributed supplier
- Which specific hours will the team be reachable, and is that in the contract?
- Who is my contact in my own time zone, and what can they decide?
- How do I find out what happened yesterday without attending a meeting?
- What happens when something breaks at 9am my time?
- Are the people on my project employed by you, or subcontracted?
That last question matters more than most clients realise. A named permanent team behaves very differently from a rotating pool of contractors, whatever the process documentation says.
Frequently asked questions
Do we ever meet in person?
What about public holidays?
Is the code quality different?
Who do we contract with?
Thinking about hiring a development team?
Send us the brief, however rough. We will tell you honestly whether we are the right people, and who we would suggest if we are not.
Related services
What we build for problems like this one