Where manufacturers differ from each other

Two manufacturers of similar size in adjacent sectors schedule production completely differently, because their constraints differ: a bottleneck machine, a curing time, an operator certification, a tooling changeover cost.

That is why generic scheduling modules disappoint. They model a factory in general, and your factory has three specific rules that decide everything.

Scheduling, the part worth building

  • The real constraint modelled explicitly — usually one machine or one skill
  • Changeover cost, which drives batching decisions
  • Curing, drying, setting and other fixed waits
  • Operator certifications, so nobody is scheduled to a machine they cannot run
  • Material availability, checked against actual stock rather than an assumption
Every manufacturer we have worked with had a scheduling rule the planner knew and no system captured. That rule is the project.

Shop-floor capture

Production data is captured on paper and typed in later, or not captured at all. Same-day capture changes what management can see and dramatically improves the scheduling that depends on it.

  1. Job start and finish, scanned rather than typed
  2. Quantity produced and scrapped, with a reason code
  3. Downtime with a cause, which is where improvement comes from
  4. Material consumed, so stock stays accurate
  5. Quality checks recorded at the point of inspection

Ruggedised tablets or scanners on the floor, with an interface that works in gloves and does not require typing. If it needs a keyboard it will not be used.

Traceability

Regulated sectors require batch and lot traceability; increasingly customers require it regardless. Retrofitting it is much harder than designing it in.

  • Every batch linked to the raw material lots it consumed
  • Every despatch linked to the batches it contained
  • A recall answerable in minutes rather than days
  • Certificates of conformity generated from the data

What to buy

FunctionBuy or buildWhy
AccountingBuyCommodity, and regulated
Stock and purchasingBuyWell served by products
Production schedulingBuildYour constraints are specific
Shop-floor captureBuildMust fit your process and hardware
Quality and traceabilityBuild or extendSector-specific requirements
CRMBuyCommodity

Frequently asked questions

Do we need a full MES?

Below a certain size, no. A scheduling and capture layer over your existing stock system gives most of the benefit at a fraction of the cost.

Can you connect to our machines?

Where they expose data, yes — many modern machines do, and older ones sometimes via sensors. We scope this carefully because it varies enormously.

How long does a manufacturing project take?

Twelve to twenty-four weeks for scheduling and capture, phased so the first useful piece lands inside three months.

What is the fastest win?

Shop-floor capture. It improves stock accuracy, scheduling and costing simultaneously because all three depend on knowing what actually happened.

Keep reading

Want software that fits how your sector actually works?

Tell us about your operation. We will tell you what to buy, what to build and what to leave exactly as it is.